== Plan ==
== Plan ==
# '''Location:''' UNEFA-Delta Amacuro, Tucupita, Delta Amacuro State, Venezuela.
# '''Location:''' UNEFA-Delta Amacuro, Tucupita, Delta Amacuro State, Venezuela.
# '''Dates:''' : August 15th-18th 2013
# '''Dates:''' : December 13th-14th 2013
# '''Schedule'''
# '''Schedule'''
## Day 1, August 16th, 9am to 5pm
## Day 1, December 13th, 9am to 5pm
##* Introduction, welcome.
##* Introduction, welcome.
##* Warao in glibc, the starting point, a new language in Linux.
##* Warao in glibc, the starting point, a new language in Linux.
Line 36: Line 36:
##* Introduction to software translation
##* Introduction to software translation
##* Transifex and Fedora
##* Transifex and Fedora
## Day 2, August 17th, 9am to 5pm
## Day 2, December 14th, 9am to 5pm
##* git introduction.
##* git introduction.
##* Packaging workshop.
##* Packaging workshop.

Latest revision as of 13:54, 6 November 2013

This is the main page for FAD Fedora Warao 2013 startup, which is a FAD focused on Fedora Warao.

Purpose

  1. Our purpose is to build Fedora Warao l10n/i18n team with the following primary goals:
    • Add Warao to glibc (wba)
    • Train translators
    • Train members of the Warao team in the use of free software through fedora in order to keep the language alive. Empowering the 3390 decree.
    • Setup infrastructure for new language wba including resources such as mailing lists, etc.
  2. In addition, we will attempt to complete the following secondary goals as time allows:
    • Train on packaging to complement
    • Train on Fedora Documentation Project
    • Train on developing apps with l10n/i18n support.

Planning Prerequisites

See the How to organize a FAD list; you can keep your to-do list here.

  • Completed work item
  • Work out budget
  • Decide on Dates and Location
  • Arrange Facilities
  • List Resources
  • Arrange Lodging
  • Arrange Refreshments
  • Arrange a Social Event

Plan

  1. Location: UNEFA-Delta Amacuro, Tucupita, Delta Amacuro State, Venezuela.
  2. Dates: : December 13th-14th 2013
  3. Schedule
    1. Day 1, December 13th, 9am to 5pm
      • Introduction, welcome.
      • Warao in glibc, the starting point, a new language in Linux.
      • Building wba team in i18n/l10n.
      • Fedora infrastructure and resources build up.
      • Introduction to software translation
      • Transifex and Fedora
    2. Day 2, December 14th, 9am to 5pm
      • git introduction.
      • Packaging workshop.
      • ¿Anaconda in Warao?
      • Deciding major pieces of software to start translating
      • Publican and Fedora Documentation Project, creating Fedora Documentation in Warao.
  4. Personnel
    • Guillermo Gómez (Caracas/Venezuela, trainner) Confirmed? (Y/N)
    • Eduardo Echeverría (Valencia/Venezuela, trainner) Confirmed? (Y/N)
    • Carlos Marcano (Maturin/Venezuela, local organizer) Confirmed? (Y/N)

Logistics

Airfare

  • Gomix, Caracas/Maturín Conviasa 833 Bs. ~ 132.25 US$ , Aserca 1.173 Bs. (186.25 US$), Venezolana (1.127 Bs. ~179 US$), Rutaca 1.160.00 Bs. ~ 184 US$
  • Echevemaster, Valencia/Maturín Conviasa 833 Bs. ~ 132.25 US$ , Aserca 1.173 Bs. (186.25 US$), Venezolana (1.127 Bs. ~179 US$), Rutaca 1.160.00 Bs. ~ 184 US$ (**)
  • Total = 1.666 Bs. ~ 264.50 US$ (Conviasa)
  • Total = 2.254 Bs. ~ 358.00 US$ (Venezolana)
  • Total = 2.346 Bs. ~ 372.50 US$ (Aserca)

Bus tickets

  • Gomix, Maturín/Tucupita 240 Bs. (roundtrip)
  • Echevemaster, Maturín/Tucupita 240 Bs. (roundtrip)
  • Pelobravo, Maturín/Tucupita 240 Bs. (roundtrip)
  • Total = 720 Bs ~ 114.30 US$

Lodging

  • Check in Aug.15th.
  • Check out Auth 18th.
  • 3 single rooms.
  • 3 attendants (4days/3nights) = 1.600 Bs. ~ 254 US$
  • Posada Turística Los Manglares

Breakfasts

  • Every attendee will take care of this.

Snacks/Beverages as Lunch/refreshment/hydration:

  • d1 : 3 snacks/sandwichs/beverage = 270 Bs.
  • d2 : 3 snacks/sandwichs/beverage = 270 Bs.
  • d3 : 3 snacks/sandwichs/beverage = 270 Bs.
  • Total = 810 Bs ~ 128.73 US$

Dinners:

  • d0 : 3 dinners = hamburgers/drink = 225 Bs.
  • d1 : 3 dinners = hamburgers / drink = 225 Bs.
  • d2 : 3 dinners << social event pending to define with the whole crew of Fedora Warao = pizzas/drink = 825
  • Total = 1275 Bs ~ 202.63 US$

Budget

  1. Travel: $A for airfare, bus, train, etc. funding needed to get attendees to the FAD
    • Airfare from Caracas/Valencia > Maturin ~ 740 US$ (2 persons)
    • Bus tickets Maturin > Tucupita ~ 115 (3 persons)
    • $A = 855 US$
  2. Housing: $B for hotel, needed to have attendees sleep during the FAD ~ 254 US$
  3. Supplies: $D for anything else you may need
  4. Food:
    • Snacks/beverages 130 US$
    • Dinners 200 US$
    • $C = 330 US$

Total budget: $A + $B +C = 855 + 254 + 330 = 1.439 US$

Detailed Work Items

Final Attendees