No edit summary |
(this should probably be only in ResultsDB_Legacy category) |
||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
=== | = Database schema = | ||
== Current WIP for Taskbot == | |||
[[Image:ResultsDB_v2.png]] | |||
== Current AutoQA/Production Schema == | |||
[[Image:Autoqa_resultdb_dbschema_4.png]] | [[Image:Autoqa_resultdb_dbschema_4.png]] | ||
Testrun | [[File:Dbschema.dia]] | ||
The primary goal when designing the database schema was versatility. The desire was to have the ability to store test data from yet-to-be-created tests in addition to meeting the needs of 'other activities' that may become relevant in the future. | |||
== Testrun Table == | |||
The Testrun table corresponds with a single execution of a test. This table only stores the most common information, common to all current and future tests. | |||
== TestrunData Table == | |||
Any data not covered by attributes in Testrun (such as tested package/update, architecture, etc) will be stored in the TestrunData table as key-value pairs. The potential and expected keys for these key-value pairs will be defined by test metadata. It is possible to include information about 'always present' and 'sometimes present' keys <ref name='testcase_metadata'>https://fedoraproject.org/wiki/User:Jskladan/Sandbox:Rpmguard_Testcase_Metadata</ref>. | |||
== TestrunPhase Table == | |||
Testruns can be divided into phases (e.g. Setup phase of the test, downloading packages from koji) which are stored in the TestrunPhase table. If the test developer splits the test into multiple phases, each phase has its own result in addition to the global result stored in the Testrun table. Once tests are split up into phases, it will be possible to use test metadata to determine the severity of failures (e.g. a failure during the setup phase is not as severe as a failure during the test phase). | |||
== Job Table == | |||
{{admon/tip|It's safe to ignore this table at the moment|For the immediate future, there are no plans to utilize the Job table in ResultsDB. That table is in the schema to allow for the ability to group several testruns (e.g. rpmguard and conflicts for a specific package). At the time of this writing, this type of grouping is not compatibly with current scheduling methods but the grouping can be easily taken care of with various frontend implementations.}} | |||
= Expected default key-values for basic test classes = | |||
== Installation tests == | |||
* release_name | |||
* compose_date | |||
* arch | |||
== Repository tests == | |||
* repo_name | |||
* compose_date | |||
* arch | |||
== Package tests == | |||
* pkg_name | |||
* envr | |||
* arch | |||
Recommended: | |||
* koji_tag | |||
Specific keyval examples - tests using Bodhi hook: | |||
* bodhi_tag/request -- to mark in which state in Bodhi the package was | |||
Specific keyval examples - comparative tests: | |||
* counterpart_name | |||
* counterpart_envr | |||
* counterpart_koji_tag | |||
* counterpart_bodhi_tag/request, ... | |||
= Next Steps = | |||
== Package Update Acceptance Test Plan Frontend == | |||
* Create wiki metadata for [https://fedoraproject.org/wiki/QA:Package_Update_Acceptance_Test_Plan testplan] & [https://fedoraproject.org/wiki/Category:Package_Update_Acceptance_Test_Cases testcases] describing it | |||
[[ | ** Repo sanity | ||
** Upgrade path | |||
* Create simple frontend like: https://fedoraproject.org/wiki/File:Package_acceptance_dashboard.png | |||
** where do i get recent builds? | |||
** progress bar: | |||
*** how many tests there are for the testplan? - testplan wiki page | |||
*** what is the progress? - resultsdb - how to get 'the right' results? is 'take the latests tests for `envra`' way ok? Jobs in autoqa? | |||
** detailed info - detailed state of the testcases (passed/failed/running, detailed phases [if described on the wiki page]) | |||
[[Category:ResultsDB_Legacy]] | |||
[[ |
Latest revision as of 14:49, 7 May 2020
Database schema
Current WIP for Taskbot
Current AutoQA/Production Schema
The primary goal when designing the database schema was versatility. The desire was to have the ability to store test data from yet-to-be-created tests in addition to meeting the needs of 'other activities' that may become relevant in the future.
Testrun Table
The Testrun table corresponds with a single execution of a test. This table only stores the most common information, common to all current and future tests.
TestrunData Table
Any data not covered by attributes in Testrun (such as tested package/update, architecture, etc) will be stored in the TestrunData table as key-value pairs. The potential and expected keys for these key-value pairs will be defined by test metadata. It is possible to include information about 'always present' and 'sometimes present' keys [1].
TestrunPhase Table
Testruns can be divided into phases (e.g. Setup phase of the test, downloading packages from koji) which are stored in the TestrunPhase table. If the test developer splits the test into multiple phases, each phase has its own result in addition to the global result stored in the Testrun table. Once tests are split up into phases, it will be possible to use test metadata to determine the severity of failures (e.g. a failure during the setup phase is not as severe as a failure during the test phase).
Job Table
Expected default key-values for basic test classes
Installation tests
- release_name
- compose_date
- arch
Repository tests
- repo_name
- compose_date
- arch
Package tests
- pkg_name
- envr
- arch
Recommended:
- koji_tag
Specific keyval examples - tests using Bodhi hook:
- bodhi_tag/request -- to mark in which state in Bodhi the package was
Specific keyval examples - comparative tests:
- counterpart_name
- counterpart_envr
- counterpart_koji_tag
- counterpart_bodhi_tag/request, ...
Next Steps
Package Update Acceptance Test Plan Frontend
- Create simple frontend like: https://fedoraproject.org/wiki/File:Package_acceptance_dashboard.png
- where do i get recent builds?
- progress bar:
- how many tests there are for the testplan? - testplan wiki page
- what is the progress? - resultsdb - how to get 'the right' results? is 'take the latests tests for
envra
' way ok? Jobs in autoqa?
- detailed info - detailed state of the testcases (passed/failed/running, detailed phases [if described on the wiki page])