From Fedora Project Wiki
No edit summary |
m (→Execution) |
||
(66 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
The overall budget from Red Hat for | The overall budget from Red Hat for [[FUDCon:Toronto 2009]] is currently '''$19,000'''. | ||
* Fedora Engineering (Paul Frields & Tom Callaway): $4,000 | * Fedora Engineering (Paul Frields & Tom Callaway): $4,000 in Q4 | ||
* Community Architecture (Max Spevack): $5,000 in Q3 | * Community Architecture (Max Spevack): $5,000 in Q3 | ||
* Community Architecture (Max Spevack): $10,000 in Q4 | * Community Architecture (Max Spevack): $10,000 in Q4 | ||
== Execution == | |||
=== Current budget === | |||
[[File:Fudcon-Toronto-2009-expenses.ods]] | |||
=== Notes === | |||
http://mchua.fedorapeople.org/fudcon/fudcon-expenses.ods is the version of the budget spreadsheet from the revision immediately before the first wiki-uploaded one. | |||
<!-- This table will help show what's being spent, on whom, and when. --> | |||
{| | |||
! Name of Traveler/Vendor !! Item Description !! Q3 CA !! Q4 CA !! Q3 FE !! Q4 FE !! Comments !! Done? | |||
|- | |||
! colspan=8 align=center | Airfares | |||
|- | |||
| Bill Nottingham || Airfare || <strike>300</strike> || || || || || Y, was already booked from Tim's budget | |||
|- | |||
| Seth Vidal || Airfare || || || <strike>466</strike> || || || Paid for out of FE Q3 -- does not impact bottom line | |||
|- | |||
| Adam Miller || Airfare || <strike>$262.70</strike> || || || || Covered by FAmNA sponsorship, flying to Boston and busing. || Y | |||
|- | |||
| Ian Weller || Airfare || || || <strike>$298.90</strike> || || || Paid out of FE Q3 | |||
|- | |||
| Matthew Daniels || Airfare || <strike>550</strike> || || || || dgilmore donated frequent flyer miles - thanks! || | |||
|- | |||
| Simon Birtwistle || Airfare || || || <strike>$826.12</strike> || || || Paid out of FE Q3 | |||
|- | |||
! Subtotal || || || || || || | |||
|- | |||
! colspan=7 align=center | Lodging | |||
|- | |||
| Adam Miller || Lodging || || <strike>200</strike> || || || Covered by FAmNA sponsorship! | |||
|- | |||
! Subtotal || || || || || || | |||
|- | |||
! colspan=7 align=center | Other costs | |||
|- | |||
! Subtotal || || || || || || | |||
|- | |||
! TOTAL || || || || || || | |||
|} | |||
<!-- | |||
## Remove this since it's no longer needed | |||
== Needs == | == Needs == | ||
Into this total we must fit the following requirements: | Into this total we must fit the following requirements: | ||
* Bus from Westford (~$4K) | |||
* Travel for the following remotees from the Fedora Engineering team ($5.1K) | |||
** Flights: | |||
*** Bill Nottingham (~$300) | |||
*** Toshio Kuratomi (~$300) | |||
*** Mike McGrath (~$300) | |||
*** Stephen Smoogen (~$300) | |||
*** Paul W. Frields (~$300) | |||
*** Seth Vidal (~$300) | |||
*** Max Spevack (~$300) | |||
*** Greg DeKoenigsberg (~$300) | |||
*** Karsten Wade (~$300) | |||
*** Mel Chua (~$300) | |||
** Lodging+: | |||
*** Bill Nottingham (~$150) | |||
*** Toshio Kuratomi (~$150) | |||
*** Mike McGrath (~$150) | |||
*** Stephen Smoogen (~$150) | |||
*** Paul W. Frields (~$150) | |||
*** Dave Jones (~$200) | |||
*** Chuck Ebbert (~$300) ? | |||
*** Luke Macken (~$200) | |||
*** Tom 'spot' Callaway (~$200) | |||
*** John Palmieri (~$200) | |||
*** Max Spevack (~$300) ? | |||
*** Greg DeKoenigsberg (~$300) ? | |||
*** Karsten Wade (~$300) ? | |||
*** Mel Chua (~$300) ? | |||
*** ''did I miss anyone?'' | |||
* Lunch on Saturday | * Lunch on Saturday | ||
* | * Lunch on Sunday | ||
* Lunch on Monday | |||
* Travel and lodging sponsorship for the following people. | * Travel and lodging sponsorship for the following people. | ||
** | ** Kevin Higgins (release party contest winner) (~$700) | ||
** | ** Sebastian Dziallas (due to .edu-related opportunities @ FUDCon) (~$700) | ||
** | ** Adam Miller (~$600) [FAmNA sponsored] | ||
* FUDPub on Saturday evening (food + 1 beverage?) -- $ | ** Simon Birtwistle? (note, travel from London) (~$1.2K) | ||
** Matthew Daniels (~$600) | |||
** Eric Christensen (~$600) | |||
* FUDPub on Saturday evening (food + 1 beverage?) -- $3.5K | |||
* Setup costs for venue -- $0 | * Setup costs for venue -- $0 | ||
* Advertising? | * Advertising? | ||
* Schwag -- ~$7 per pre-registrant? ($ | * Schwag -- ~$7 per pre-registrant? ($1K for t-shirts) | ||
* ''ESTIMATED TOTAL so far:'' $19.9K | |||
ARCHIVAL NOTE FROM F11 FUDCON: '''Why food for some, not for others?''' Red Hat folks get a per diem. A couple other people get per diem because they're not dayjobbers and don't typically have those expenses either. | ARCHIVAL NOTE FROM F11 FUDCON: '''Why food for some, not for others?''' Red Hat folks get a per diem. A couple other people get per diem because they're not dayjobbers and don't typically have those expenses either. | ||
Line 28: | Line 107: | ||
| || || || | | || || || | ||
|} | |} | ||
--> |
Latest revision as of 09:28, 30 November 2009
The overall budget from Red Hat for FUDCon:Toronto 2009 is currently $19,000.
- Fedora Engineering (Paul Frields & Tom Callaway): $4,000 in Q4
- Community Architecture (Max Spevack): $5,000 in Q3
- Community Architecture (Max Spevack): $10,000 in Q4
Execution
Current budget
File:Fudcon-Toronto-2009-expenses.ods
Notes
http://mchua.fedorapeople.org/fudcon/fudcon-expenses.ods is the version of the budget spreadsheet from the revision immediately before the first wiki-uploaded one.
Name of Traveler/Vendor | Item Description | Q3 CA | Q4 CA | Q3 FE | Q4 FE | Comments | Done? |
---|---|---|---|---|---|---|---|
Airfares | |||||||
Bill Nottingham | Airfare | Y, was already booked from Tim's budget | |||||
Seth Vidal | Airfare | Paid for out of FE Q3 -- does not impact bottom line | |||||
Adam Miller | Airfare | Covered by FAmNA sponsorship, flying to Boston and busing. | Y | ||||
Ian Weller | Airfare | Paid out of FE Q3 | |||||
Matthew Daniels | Airfare | dgilmore donated frequent flyer miles - thanks! | |||||
Simon Birtwistle | Airfare | Paid out of FE Q3 | |||||
Subtotal | |||||||
Lodging | |||||||
Adam Miller | Lodging | Covered by FAmNA sponsorship! | |||||
Subtotal | |||||||
Other costs | |||||||
Subtotal | |||||||
TOTAL |