From Fedora Project Wiki

(Add hospitality and hack suites)
(Add a URL for Robyn's updated version)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
This page tracks the budget for the [[FUDCon:Tempe 2011]] event.
This page tracks the budget for the [[FUDCon:Tempe 2011]] event.
[[User:Rbergero|Robyn Bergeron]] has created [https://spreadsheets.google.com/ccc?key=0AhtE3PhGXQCndDg4dnk4WEFMS1hBdHAwMUhfdTZsalE&hl=en a more up to date spreadsheet here].


== Estimates ==
== Estimates ==
Line 15: Line 17:
|-
|-
| MemU rooms and equipment (Mon) ||  ||  ||  ||  ||  || $  500
| MemU rooms and equipment (Mon) ||  ||  ||  ||  ||  || $  500
|-
| Deposit for hotel block ||  || $1,000 ||  ||  ||  ||
|-
|-
| Printing and materials (badges, etc.) ||  ||  ||  || $  500 ||  ||
| Printing and materials (badges, etc.) ||  ||  ||  || $  500 ||  ||
Line 26: Line 26:
| Coffee/danish for 150 (Sun) ||  ||  ||  ||  ||  || $  750
| Coffee/danish for 150 (Sun) ||  ||  ||  ||  ||  || $  750
|-
|-
| FUDPub food & space (Sat) ||  ||  ||  ||  || $4,000 ||
| FUDPub food & space (Sat) (space: $700) ||  ||  ||  ||  || $4,000 ||
|-
|-
| Swag ||  ||  ||  || $1,500 ||  ||
| Swag ||  ||  ||  || $1,500 ||  ||
Line 42: Line 42:
| 4@ Airfare from Fedora Eng ||  ||  ||  || $1,200 ||  ||
| 4@ Airfare from Fedora Eng ||  ||  ||  || $1,200 ||  ||
|-
|-
| Travel subsidies, airfares and hotel ||  ||  ||  ||  ||  || $8,500
| Travel subsidies, airfares and hotel<br/>'''(these need to be broken out by quarter)''' ||  ||  ||  ||  ||  || $8,500
|-
| Hospitality suite (Fri) ||  ||  ||  ||  ||  || $  200
|-
|-
| Hack suite (Fri-Sun) ||  ||  ||  ||  ||  || $  700
| Hack/hosp. suite (Fri-Sun) ||  ||  ||  ||  ||  || $  700
|-
|-
! TOTALS <!-- Ugh, manual. --> !! $1,000 !! $1,000 !! $1,200 !! $3,200 !! $6,150 !! $12,175
! TOTALS <!-- Ugh, manual. --> !! $1,000 !! $0 !! $1,200 !! $3,200 !! $6,150 !! $12,175
|}
|}


Running total: ''$24,725''. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.
Running total: ''$23,725''. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.


'''Important note:''' This really doesn't raise the budget for FUDCon to >$25K.  Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.
'''Important note:''' This really doesn't raise the budget for FUDCon to >$25K.  Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.

Latest revision as of 21:28, 14 December 2010

This page tracks the budget for the FUDCon:Tempe 2011 event.

Robyn Bergeron has created a more up to date spreadsheet here.

Estimates

Key: FE = Fedora Engineering; CA = Community Architecture. Hotel costs are expressed as $600 for 3 nights, double occupancy. So for every 2 people, it's a $600 cost.

Estimated cost
! Item FE Q2 CA Q2 FE Q3 CA Q3 FE Q4 CA Q4
Facilities
UTO (tech support) overtime (Sun) $ 750
MemU rooms and equipment (Mon) $ 500
Printing and materials (badges, etc.) $ 500
Food, drink, hospitality
Coffee/danish for 150 (Sat) $ 750
Coffee/danish for 150 (Sun) $ 750
FUDPub food & space (Sat) (space: $700) $4,000
Swag $1,500
Blue Disposable Earplugs - 200 count $25
Travel
3@ Airfare from Fedora Eng $1,000
12@ Hotel from Fedora Eng $2,150
4@ Airfare from Fedora Eng $1,200
4@ Airfare from Fedora Eng $1,200
Travel subsidies, airfares and hotel
(these need to be broken out by quarter)
$8,500
Hack/hosp. suite (Fri-Sun) $ 700
TOTALS $1,000 $0 $1,200 $3,200 $6,150 $12,175

Running total: $23,725. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.

Important note: This really doesn't raise the budget for FUDCon to >$25K. Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.

Other resources

Here's a Google spreadsheet where we're tallying subsidies, just for good measure.