From Fedora Project Wiki
< Ambassadors | APAC
(→Events) |
m (Tuanta moved page Ambassadors/APAC/Budget to Ambassadors/APAC/Budget:2014) |
||
(22 intermediate revisions by the same user not shown) | |||
Line 144: | Line 144: | ||
! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ||
|- | |- | ||
| Fedora Presence at Vietnam FOSS Conference || 200 || 150 || | | Fedora Presence at Vietnam FOSS Conference || 200 || 150 || 181.79 || [https://fedorahosted.org/fedora-apac/ticket/76 #76] reimbursed | ||
|- | |- | ||
| <del>Vietnam Summer of Code 2013</del> || <del>250</del> || <del>200</del> || || Postponed to Q3 | | <del>Vietnam Summer of Code 2013</del> || <del>250</del> || <del>200</del> || || Postponed to Q3 | ||
Line 166: | Line 166: | ||
| <del>*NixCon in Bangladesh</del> || <del>300</del> || <del>210</del> || || Cancelled or Postponed?? | | <del>*NixCon in Bangladesh</del> || <del>300</del> || <del>210</del> || || Cancelled or Postponed?? | ||
|- | |- | ||
| Fedora 18 Release Party (Danang, Vietnam) || 130 || 130 || | | Fedora 18 Release Party (Danang, Vietnam) || 130 || 130 || 108.85 || [https://fedorahosted.org/fedora-apac/ticket/63 #63] reimbursed | ||
|- | |- | ||
| Fedora 18 Release Party (Danang, Vietnam) || 30 || 30 || | | Fedora 18 Release Party (Danang, Vietnam) || 30 || 30 || 31.89 || [https://fedorahosted.org/fedora-apac/ticket/62 #62] reimbursed | ||
|- | |- | ||
| '''Sub Total (scheduled items) || || 760 || | | '''Sub Total (scheduled items) || || '''760''' || '''322.53''' || | ||
|- | |- | ||
| '''Budget available by cancelled-items || || 1,995 || || | | '''Budget available by cancelled-items || || '''1,995''' || || | ||
|- | |- | ||
| '''NOT scheduled items (below) || || || || | | '''NOT scheduled items (below) || || || || | ||
Line 182: | Line 182: | ||
| FAD Mysore 2013 Accommodation for shakthimaan || || || 102.95 || [https://fedorahosted.org/fedora-apac/ticket/73 #73] reimbursed | | FAD Mysore 2013 Accommodation for shakthimaan || || || 102.95 || [https://fedorahosted.org/fedora-apac/ticket/73 #73] reimbursed | ||
|- | |- | ||
| '''Sub Total (NOT-scheduled items) || || || 751.3 || | | '''Sub Total (NOT-scheduled items) || || || '''751.3''' || | ||
|- | |- | ||
! Total !! $3,900 !! $2,755 !! 1, | ! Total !! $3,900 !! $2,755 !! 1,073.83 !! | ||
|} | |} | ||
Line 209: | Line 209: | ||
==== Total quarterly budget ==== | ==== Total quarterly budget ==== | ||
{| | {| | ||
! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost | ! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost !! Left Amount | ||
|- | |- | ||
| '''$3,900''' || '''$2,755''' || '''$45''' || '''$2,800''' || | | '''$3,900''' || '''$2,755''' || '''$45''' || '''$2,800''' || '''$1,073.83''' || '''$1,726.17''' | ||
|} | |} | ||
Line 221: | Line 221: | ||
! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ||
|- | |- | ||
| Fedora 19 Release Parties in Vietnam || 450 || 300 || || [https://fedorahosted.org/fedora-apac/ticket/88 #88] | | Fedora 19 Release Parties in Vietnam || 450 || 300 || 304 || [https://fedorahosted.org/fedora-apac/ticket/88 #88] reimbursed <br> [https://fedorahosted.org/fedora-apac/ticket/84 #84] reimbursed | ||
|- | |- | ||
| <del>Linux Day 2013 Hanoi</del> || <del>100</del> || <del>100</del> || || Cancelled. Held in Cantho together with [[Fedora_Community_Engagement_Can_Tho_2013|Fedora Community Engagement Cantho 2013]] | | <del>Linux Day 2013 Hanoi</del> || <del>100</del> || <del>100</del> || || Cancelled. Held in Cantho together with [[Fedora_Community_Engagement_Can_Tho_2013|Fedora Community Engagement Cantho 2013]] | ||
Line 243: | Line 243: | ||
| Fedora 19 Event Monthly in Japan || 200 || 200 || || | | Fedora 19 Event Monthly in Japan || 200 || 200 || || | ||
|- | |- | ||
| Fedora 19 Release Party and Event in China || 450 || 350 || || | | Fedora 19 Release Party and Event in China || 450 || 350 || 108 || [https://fedorahosted.org/fedora-apac/ticket/91 #91] reimbursed | ||
|- | |- | ||
| Fedora 19 Release Party in Sri Lanka || 300 || 210 || || | | Fedora 19 Release Party in Sri Lanka || 300 || 210 || || | ||
|- | |- | ||
| Local community gathering in Sri Lanka || 500 || 350 || || | | Local community gathering in Sri Lanka || 500 || 350 || 330.99 || [https://fedorahosted.org/fedora-apac/ticket/74 #74] reimbursed | ||
|- | |- | ||
| Fedora 19 Release Parties in Bangladesh || 600 || 420 || || | | Fedora 19 Release Parties in Bangladesh || 600 || 420 || || | ||
|- | |- | ||
! Total !! $6,050 !! $4,640 !! !! | | '''Sub Total (scheduled items) || || '''4,540''' || '''742.99''' || | ||
|- | |||
| '''Budget available by cancelled-items || || '''''' || || | |||
|- | |||
| '''NOT scheduled items (below) || || || || | |||
|- | |||
| Funds for Cultural Freedom Day for amani || || || 49.36 || [https://fedorahosted.org/fedora-apac/ticket/80 #80] reimbursed | |||
|- | |||
| Release Party F19 Taipei || || || 146 || [https://fedorahosted.org/fedora-apac/ticket/89 #89] reimbursed | |||
|- | |||
| Sending an OLPC to Bckurera || || || 53.31 || [https://fedorahosted.org/fedora-apac/ticket/44 #44] reimbursed | |||
|- | |||
| '''Sub Total (NOT-scheduled items) || || || '''248.67''' || | |||
|- | |||
! Total !! $6,050 !! $4,640 !! $991.57 !! | |||
|} | |} | ||
Line 282: | Line 296: | ||
==== Total quarterly budget ==== | ==== Total quarterly budget ==== | ||
{| | {| | ||
! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost | ! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost !! Left Amount | ||
|- | |- | ||
| '''$10,200''' || '''$7,590''' || '''0''' (get $190 from Q3) || '''$7,400''' || | | '''$10,200''' || '''$7,590''' || '''0''' (get $190 from Q3) || '''$7,400''' || '''$991.57''' || '''$6,408.43''' | ||
|} | |} | ||
Line 294: | Line 308: | ||
! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ||
|- | |- | ||
| Software Freedom Day 2013 Hanoi || 200 || 200 || || | | Software Freedom Day 2013 Hanoi || 200 || 200 || $65.5 || [https://fedorahosted.org/fedora-apac/ticket/94 #94] reimbursed. | ||
|- | |- | ||
| FOSS Asia 2013 Ho Chi Minh City || 200 || 150 || || | | FOSS Asia 2013 Ho Chi Minh City || 200 || 150 || || It's delayed to Feb 2014. See: [[FOSSASIA_2014|FOSSASIA 2014]]. It is also relocated to Phnom Penh, Cambodia so the cost could be different. | ||
|- | |- | ||
| Fedora workshop (West Bengal) || 300 || 210 || || | | Fedora workshop (West Bengal) || 300 || 210 || || | ||
Line 304: | Line 318: | ||
| Fedora 18 Event Monthly in Japan || 600 || 0 || || | | Fedora 18 Event Monthly in Japan || 600 || 0 || || | ||
|- | |- | ||
| Software Freedom Day 2013 in China || 200 || 70 || || | | Software Freedom Day 2013 in China || 200 || 70 || 67.52 || [https://fedorahosted.org/fedora-apac/ticket/93 #93] reimbursed | ||
|- | |- | ||
| Software Freedom Day 2013 in Sri Lanka || 300 || 210 || || | | Software Freedom Day 2013 in Sri Lanka || 300 || 210 || || | ||
Line 312: | Line 326: | ||
| Digital World 2013 in Bangladesh || 400 || 280 || || | | Digital World 2013 in Bangladesh || 400 || 280 || || | ||
|- | |- | ||
! Total !! $2,600 !! $1,400 !! !! | | '''Sub Total (scheduled items) || || || '''$133.02''' || | ||
|- | |||
| '''NOT scheduled items (below) || || || || | |||
|- | |||
| Fabian Affolter Fedora tibetan L10n || || || 543.64 || [https://fedorahosted.org/emea-swag-tracking/ticket/252 #EMEA 252] reimbursed | |||
|- | |||
| '''Sub Total (NOT-scheduled items) || || || '''$543.64''' || | |||
|- | |||
! Total !! $2,600 !! $1,400 !! '''$676.66''' !! | |||
|} | |} | ||
Line 320: | Line 342: | ||
! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ||
|- | |- | ||
| || || || || | | Fedora Buttons and Stickers || || || 290 || [https://fedorahosted.org/fedora-apac/ticket/66 #66] (produced in EMEA) | ||
|- | |||
| Fedora Pins || || || 655.20 || [https://fedorahosted.org/emea-swag-tracking/ticket/291 EMEA #291] (produced in EMEA) | |||
|- | |- | ||
! Total !! !! !! !! | ! Total !! !! !! '''$945.20''' !! | ||
|} | |} | ||
Line 337: | Line 361: | ||
==== Total quarterly budget ==== | ==== Total quarterly budget ==== | ||
{| | {| | ||
! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost | ! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost !! Left Amount | ||
|- | |- | ||
| '''$2,600''' || '''$1,400''' || '''$310''' (move $190 to Q2) || '''$1,900''' || | | '''$2,600''' || '''$1,400''' || '''$310''' (move $190 to Q2) || '''$1,900''' || '''$1621.86''' || '''$278.14''' | ||
|} | |} | ||
Line 349: | Line 373: | ||
! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ! Expense !! Planned Cost !! Allocated Cost !! Actual Cost !! Related tickets/More Info | ||
|- | |- | ||
| Fedora 20 Release Parties in Vietnam || 450 || 300 || || | | Fedora 20 Release Parties in Vietnam || 450 || 300 || 36.2 || [https://fedorahosted.org/fedora-apac/ticket/101 #101] reimbursed. | ||
|- | |||
| [http://vfossa.vn/ VFOSSA] Congress 2013 || 250 || 175 || || cancelled | |||
|- | |||
| Fedora 20 Release Parties in Malaysia || 50 || 50 || || no fund requested. | |||
|- | |||
| Fedora 19 Release Parties in Aceh || || || 250 || [https://fedorahosted.org/fedora-apac/ticket/90 #90] waiting for reimbursement. | |||
|- | |||
| Fedora 20 Release Parties in Indonesia || 1000 || 700 || || no fund requested. | |||
|- | |||
| Fedora 20 Release Party in Philippines || 200 || 140 || || no fund requested. | |||
|- | |||
| Fedora 20 Release Party and Event Montly in Japan || 900 || 900 || 900 || For Dec 2013 [https://fedorahosted.org/fedora-apac/ticket/102 #102] waiting for reimbursement. <br> For Jan 2014 [https://fedorahosted.org/fedora-apac/ticket/103 #103] waiting for reimbursement. | |||
|- | |||
| Fedora 20 Release Party and Event in China || 450 || 350 || 188.6 || In Beijing [https://fedorahosted.org/fedora-apac/ticket/99 #99] reimbursed. <br> In Shanghai [https://fedorahosted.org/fedora-apac/ticket/100 #100] reimbursed. | |||
|- | |||
| Fedora 20 Release Party in Sri Lanka || 300 || 210 || || no fund requested. | |||
|- | |||
| Local community gathering in Sri Lanka || 500 || 350 || || no fund requested. | |||
|- | |||
| Fedora 20 Release Parties in Bangladesh || 600 || 420 || || no fund requested. | |||
|- | |||
| '''Sub Total (scheduled items) || || || '''$1374.8''' || | |||
|- | |||
| '''NOT scheduled items (below) || || || || | |||
|- | |||
| Funding for OLPC Basecamp 2013 || || || 252 || [https://fedorahosted.org/fedora-apac/ticket/96 #96] waiting for reimbursement. | |||
|- | |||
| Funding Request for event infra/swag/snacks/miscellaenous tidbits at FOSSASIA 2014 || || || 900 || [https://fedorahosted.org/fedora-apac/ticket/97 #97] waiting for reimbursement. | |||
|- | |- | ||
| | | Travel subsidy for kushal to FOSSASIA 2014 || || || 580 || [https://fedorahosted.org/fedora-apac/ticket/98 #98] waiting for reimbursement. | ||
|- | |- | ||
| | | Travel subsidy for tuanta to FOSSASIA 2014 || || || 394 || [https://fedorahosted.org/fedora-apac/ticket/105 #105] reimbursed. | ||
|- | |- | ||
| | | Travel subsidy for nangthang to FOSSASIA 2014 || || || 394 || [https://fedorahosted.org/fedora-apac/ticket/106 #106] reimbursed. | ||
|- | |- | ||
| | | Travel subsidy for vanhonit to FOSSASIA 2014 || || || 70 || [https://fedorahosted.org/fedora-apac/ticket/110 #110] waiting for reimbursement. | ||
|- | |- | ||
| | | Travel subsidy for udinnet to FOSSASIA 2014 || || || 605 || [https://fedorahosted.org/fedora-apac/ticket/111 #111] waiting for reimbursement. | ||
|- | |- | ||
| | | Travel subsidy for Sarup Banskota to FOSSASIA 2014 || || || 624 || [https://fedorahosted.org/fedora-apac/ticket/115 #115] reimbursed. | ||
|- | |- | ||
| Fedora | | Accommodation for Fedora Ambassadors during FOSSASIA 2014 || || || 660 || [https://fedorahosted.org/fedora-apac/ticket/107 #107] waiting for reimbursement. | ||
|- | |- | ||
| | | Release Party F20 Taipei || || || 150 || [https://fedorahosted.org/fedora-apac/ticket/104 #104] waiting for reimbursement. | ||
|- | |- | ||
| | | '''Sub Total (NOT-scheduled items) || || || '''$4,529''' || | ||
|- | |- | ||
! Total !! $4,900 !! $3,595 !! !! | ! Total !! $4,900 !! $3,595 !! '''$5,903.8''' !! extra cost is covered by money left in previous quarters | ||
|} | |} | ||
Line 394: | Line 446: | ||
==== Total quarterly budget ==== | ==== Total quarterly budget ==== | ||
{| | {| | ||
! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost | ! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost !! Left Amount || Comment | ||
|- | |- | ||
| '''$7,100''' || '''$5,145''' || '''$55''' || '''$5,200''' || | | '''$7,100''' || '''$5,145''' || '''$55''' || '''$5,200''' || '''$5,903.8''' || '''-$703.8''' || extra cost is covered by money left in previous quarters | ||
|} | |} | ||
=== TOTAL FY2014 BUDGET === | === TOTAL FY2014 BUDGET === | ||
{| | {| | ||
! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost | ! Planned Cost !! Adjusted Cost !! Reserved Cost !! Allocated Cost !! Actual Cost !! Left Amount | ||
|- | |- | ||
| '''$23,800''' || '''$16,890''' || '''$410''' || '''$17,300''' || | | '''$23,800''' || '''$16,890''' || '''$410''' || '''$17,300''' || '''$9,591.06''' || '''$7,708.94''' | ||
|} | |} | ||
Latest revision as of 10:19, 27 June 2015
Following are the information on the APAC regional budget allocations.
FY13 / APAC Budget
Total regional budget: N/A
Total spend (through ): 757.71
Approved
Description | Approved | APAC Trac # | Amount / $ |
---|---|---|---|
Agreed on 2012-03-17 meeting | #19 | ||
Agreed on 2012-04-14 meeting | #21 | ||
Site rental expense for Fedora 17 release party in Taiwan | Agreed on 2012-04-14 meeting | #23 | 170 |
500 buttons for APAC | Agreed on 2012-04-28 meeting | #26 | 100 |
Booth on Apache bar camp, Kandy | Agreed on 2012-05-05 meeting | #25 | 40 |
Funding request for F17 release party Hanoi | Agreed on 2012-06-09 meeting | #28 | 145 |
F17 Media Production for Sri Lanka | Agreed on 2012-06-09 meeting | #29 | 263 |
Funding Request for FAD Padang | Agreed on 2012-06-23 meeting | #27 | 216 |
FAD Mysore: sponosorship for hotel stay for Shakti (mbuf) | Agreed on 2013-04-20 meeting | #73 | INR 5734 |
Fedora Technical Seminar with F18 University of Rajarata, Sri Lanka (udinnet) | Agreed on 2013-05-04 meeting | #74 | 360.00 |
Total Approved amount USD : 1294.00 + INR 5734
Reimbursed
Description | Reimbursed | FY | Q | APAC Trac # | Amount / $ |
---|---|---|---|---|---|
Site rental expense for Fedora 17 release party in Taiwan | Reimbursed & Confirmed | 2013 | 2 | #23 | 170 |
Funding request for F17 release party Hanoi | Reimbursed & Confirmed | 2013 | 2 | #28 | 145 |
Funding Request for FAD Padang | Reimbursed & Confirmed | 2013 | 2 | #27 | 216 |
Travel subsidy for Michel Alexandre Salim (salimma) | Reimbursed | 2013 | 2 | #30 | 226.71 |
Sponsorship for staying in PyCon USA for Kusal Das | Reimbursed | 2013 | 2 | #68 | 542.49 |
Travel Subsidy to Fedora 18 Beijing Release Party for lovenemesis (Zongyuan He) | Reimbursed | 2013 | 2 | #64 | 118.58 |
Budget Fedora 18 Release Party - Malang, Indonesia for Jurankdankkal (Prima Yogi Loviniltra) | Reimbursed | 2013 | 2 | #54 | 136.49 |
Budget Fedora 18 Release Party - Klaten, Indonesia for arifiauo (Arif Tri Waluyo) | Reimbursed | 2013 | 2 | #47 | 283.07 |
Travel Subsidies ILC 2012 for jurankdankkal (Prima Yogi Loviniltra) | Reimbursed | 2013 | 2 | #314 | 130.72 |
Budget Fedora 18 Release Party - Aceh, Indonesia for arifiauo (Arif Tri Waluyo) | Reimbursed | 2013 | 2 | #53 | 172.87 |
Support for Fedora Activities in SFD 2012 Hanoi for tuanta (Truong Anh Tuan ) | Reimbursed | 2013 | 2 | #38 | 18.87 |
FAD Mysore: sponosorship for hotel stay for Shakti (mbuf) | Reimbursed | 2013 | 2 | #73 | INR 5734 |
FAD Mysore 2013 (Shakthi Kannan) | Reimbursed | 2013 | 2 | #69 | INR 5896 |
Total Reimbursed amount USD : 2160.80 + INR 11630
Remaining Fiscal Year 2013
Events
Expense | Planned Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|
Fedora 18 Release Parties in Vietnam | 450 | ||
Fedora 18 Release Party in Malaysia | 50 | ||
Fedora 18 Release Parties in Indonesia | 1,250 | ||
Fedora 18 Release Party in Philippines | 200 | ||
Fedora 18 Release Party and Event Montly in Japan | 900 | ||
Fedora 18 Release Party and Event in China | 300 | ||
NukeViet Users and Developers Conference 2013 | 100 | Cancelled | |
International Mother Language Day l10n training and sprint | 100 | ||
Total | $3,350 |
SWAG
Expense | Planned Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|
Tshirt, cap and some others in Vietnam | 300 | ||
Fedora Polo Shirts & Collaterals in Philippines | 300 | ||
Total | $600 |
Shipping
Expense | Planned Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|
NONE | still produce swag and media locally as usual. | ||
Total |
TOTAL REMAINING FY2013 BUDGET: $3,950
Fiscal Year 2014
References
- FY14 Global Allocated Budget
- FY 2014 - budget for SWAG production - RFC proposed by Buddhike Kurera
- Japan FY2014 Budget
- Philippines FY2014 Budget
- India FY2014 Budget
- Indonesia FY2014 Budget
- Malaysia FY2014 Budget
- Vietnam FY2014 Budget
- China FY2014 Budget
- Bangladesh FY2014 Budget
- Sri Lanka FY2014 Budget
Q1 (March - May 2013)
Events
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Fedora Presence at Vietnam FOSS Conference | 200 | 150 | 181.79 | #76 reimbursed |
Postponed to Q3 | ||||
Postponed to Q2 | ||||
Cancelled or Postponed?? | ||||
Cancelled or Postponed?? | ||||
Cancelled or Postponed?? | ||||
Fedora 18 Event Monthly in Japan | 600 | 450 | #77 opened | |
Cancelled | ||||
Cancelled or Postponed?? | ||||
Cancelled or Postponed?? | ||||
Fedora 18 Release Party (Danang, Vietnam) | 130 | 130 | 108.85 | #63 reimbursed |
Fedora 18 Release Party (Danang, Vietnam) | 30 | 30 | 31.89 | #62 reimbursed |
Sub Total (scheduled items) | 760 | 322.53 | ||
Budget available by cancelled-items | 1,995 | |||
NOT scheduled items (below) | ||||
Sponsorship for kushal staying in PyCon USA | 542.49 | #68 reimbursed | ||
FAD Mysore 2013 Travel for shakthimaan | 105.86 | #69 reimbursed | ||
FAD Mysore 2013 Accommodation for shakthimaan | 102.95 | #73 reimbursed | ||
Sub Total (NOT-scheduled items) | 751.3 | |||
Total | $3,900 | $2,755 | 1,073.83 |
SWAG
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Total |
Shipping
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Total |
Total quarterly budget
Planned Cost | Adjusted Cost | Reserved Cost | Allocated Cost | Actual Cost | Left Amount |
---|---|---|---|---|---|
$3,900 | $2,755 | $45 | $2,800 | $1,073.83 | $1,726.17 |
Q2 (June - August 2013)
Events
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Fedora 19 Release Parties in Vietnam | 450 | 300 | 304 | #88 reimbursed #84 reimbursed |
Cancelled. Held in Cantho together with Fedora Community Engagement Cantho 2013 | ||||
Fedora 19 Release Parties in Malaysia | 50 | 50 | ||
Malaysia Open Source Conference | 200 | 150 | ||
Fedora 19 Release Parties in Indonesia | 1000 | 700 | ||
Fedora workshop (Jadavpur University, Kolkatta) | 300 | 210 | ||
Fedora workshop (Durgapur, West Bengal) | 300 | 210 | ||
Fedora 19 Release Party in Philippines | 200 | 140 | ||
Linux Day 2013 | 500 | 350 | ||
Fedora 19 Release Party and Event Montly in Japan | 900 | 900 | ||
Fedora 19 Event Monthly in Japan | 200 | 200 | ||
Fedora 19 Release Party and Event in China | 450 | 350 | 108 | #91 reimbursed |
Fedora 19 Release Party in Sri Lanka | 300 | 210 | ||
Local community gathering in Sri Lanka | 500 | 350 | 330.99 | #74 reimbursed |
Fedora 19 Release Parties in Bangladesh | 600 | 420 | ||
Sub Total (scheduled items) | 4,540 | 742.99 | ||
Budget available by cancelled-items | ' | |||
NOT scheduled items (below) | ||||
Funds for Cultural Freedom Day for amani | 49.36 | #80 reimbursed | ||
Release Party F19 Taipei | 146 | #89 reimbursed | ||
Sending an OLPC to Bckurera | 53.31 | #44 reimbursed | ||
Sub Total (NOT-scheduled items) | 248.67 | |||
Total | $6,050 | $4,640 | $991.57 |
SWAG
Expense | Planned Cost | Actual Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Fedora 19 media | 1300 | 900 | ||
Lap Stickers | 1000 | 700 | ||
Fedora buttons | 500 | 350 | ||
Other swags | 500 | 350 | ||
Total | $3,300 | $2,300 |
Shipping
Expense | Planned Cost | Actual Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
International Postage | 900 | 650 | ||
Total | $900 | $650 |
Total quarterly budget
Planned Cost | Adjusted Cost | Reserved Cost | Allocated Cost | Actual Cost | Left Amount |
---|---|---|---|---|---|
$10,200 | $7,590 | 0 (get $190 from Q3) | $7,400 | $991.57 | $6,408.43 |
Q3 (September - November 2013)
Events
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Software Freedom Day 2013 Hanoi | 200 | 200 | $65.5 | #94 reimbursed. |
FOSS Asia 2013 Ho Chi Minh City | 200 | 150 | It's delayed to Feb 2014. See: FOSSASIA 2014. It is also relocated to Phnom Penh, Cambodia so the cost could be different. | |
Fedora workshop (West Bengal) | 300 | 210 | ||
CodeFest 2013 | 200 | 140 | ||
Fedora 18 Event Monthly in Japan | 600 | 0 | ||
Software Freedom Day 2013 in China | 200 | 70 | 67.52 | #93 reimbursed |
Software Freedom Day 2013 in Sri Lanka | 300 | 210 | ||
Software Freedom Day 2013 in Bangladesh | 200 | 140 | ||
Digital World 2013 in Bangladesh | 400 | 280 | ||
Sub Total (scheduled items) | $133.02 | |||
NOT scheduled items (below) | ||||
Fabian Affolter Fedora tibetan L10n | 543.64 | #EMEA 252 reimbursed | ||
Sub Total (NOT-scheduled items) | $543.64 | |||
Total | $2,600 | $1,400 | $676.66 |
SWAG
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Fedora Buttons and Stickers | 290 | #66 (produced in EMEA) | ||
Fedora Pins | 655.20 | EMEA #291 (produced in EMEA) | ||
Total | $945.20 |
Shipping
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Total |
Total quarterly budget
Planned Cost | Adjusted Cost | Reserved Cost | Allocated Cost | Actual Cost | Left Amount |
---|---|---|---|---|---|
$2,600 | $1,400 | $310 (move $190 to Q2) | $1,900 | $1621.86 | $278.14 |
Q4 (December 2013 - February 2014)
Events
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Fedora 20 Release Parties in Vietnam | 450 | 300 | 36.2 | #101 reimbursed. |
VFOSSA Congress 2013 | 250 | 175 | cancelled | |
Fedora 20 Release Parties in Malaysia | 50 | 50 | no fund requested. | |
Fedora 19 Release Parties in Aceh | 250 | #90 waiting for reimbursement. | ||
Fedora 20 Release Parties in Indonesia | 1000 | 700 | no fund requested. | |
Fedora 20 Release Party in Philippines | 200 | 140 | no fund requested. | |
Fedora 20 Release Party and Event Montly in Japan | 900 | 900 | 900 | For Dec 2013 #102 waiting for reimbursement. For Jan 2014 #103 waiting for reimbursement. |
Fedora 20 Release Party and Event in China | 450 | 350 | 188.6 | In Beijing #99 reimbursed. In Shanghai #100 reimbursed. |
Fedora 20 Release Party in Sri Lanka | 300 | 210 | no fund requested. | |
Local community gathering in Sri Lanka | 500 | 350 | no fund requested. | |
Fedora 20 Release Parties in Bangladesh | 600 | 420 | no fund requested. | |
Sub Total (scheduled items) | $1374.8 | |||
NOT scheduled items (below) | ||||
Funding for OLPC Basecamp 2013 | 252 | #96 waiting for reimbursement. | ||
Funding Request for event infra/swag/snacks/miscellaenous tidbits at FOSSASIA 2014 | 900 | #97 waiting for reimbursement. | ||
Travel subsidy for kushal to FOSSASIA 2014 | 580 | #98 waiting for reimbursement. | ||
Travel subsidy for tuanta to FOSSASIA 2014 | 394 | #105 reimbursed. | ||
Travel subsidy for nangthang to FOSSASIA 2014 | 394 | #106 reimbursed. | ||
Travel subsidy for vanhonit to FOSSASIA 2014 | 70 | #110 waiting for reimbursement. | ||
Travel subsidy for udinnet to FOSSASIA 2014 | 605 | #111 waiting for reimbursement. | ||
Travel subsidy for Sarup Banskota to FOSSASIA 2014 | 624 | #115 reimbursed. | ||
Accommodation for Fedora Ambassadors during FOSSASIA 2014 | 660 | #107 waiting for reimbursement. | ||
Release Party F20 Taipei | 150 | #104 waiting for reimbursement. | ||
Sub Total (NOT-scheduled items) | $4,529 | |||
Total | $4,900 | $3,595 | $5,903.8 | extra cost is covered by money left in previous quarters |
SWAG
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
Fedora 20 media | 1300 | 900 | ||
Total | $1,300 | $900 |
Shipping
Expense | Planned Cost | Allocated Cost | Actual Cost | Related tickets/More Info |
---|---|---|---|---|
International Postage | 900 | 650 | ||
Total | $900 | $650 |
Total quarterly budget
Planned Cost | Adjusted Cost | Reserved Cost | Allocated Cost | Actual Cost | Left Amount | Comment |
---|---|---|---|---|---|---|
$7,100 | $5,145 | $55 | $5,200 | $5,903.8 | -$703.8 | extra cost is covered by money left in previous quarters |
TOTAL FY2014 BUDGET
Planned Cost | Adjusted Cost | Reserved Cost | Allocated Cost | Actual Cost | Left Amount |
---|---|---|---|---|---|
$23,800 | $16,890 | $410 | $17,300 | $9,591.06 | $7,708.94 |
Archives
Past budget allocations for the region could be find below.