From Fedora Project Wiki

No edit summary
Line 5: Line 5:
We are currently working through the [[FUDCon bid process]]. See [[/Bid process]] for our work in this section.
We are currently working through the [[FUDCon bid process]]. See [[/Bid process]] for our work in this section.


== Proxima Reunion ==
25/03/2010 a las 22 horas ( Horario de Santiago - Chile )
Canal #fudcon-planning @ freenode


== Reunion 11/03/2010 22:00 ==
== Reunion 11/03/2010 22:00 ==
Line 21: Line 26:


Log:            http://meetbot.fedoraproject.org/fudcon-planning/2010-02-02/fudcon-planning.2010-02-02-01.31.log.html
Log:            http://meetbot.fedoraproject.org/fudcon-planning/2010-02-02/fudcon-planning.2010-02-02-01.31.log.html
== Proxima Reunion ==
25/03/2010 a las 22 horas ( Horario de Santiago - Chile )
Canal #fudcon-planning @ freenode


== Embajadores confirmados ==
== Embajadores confirmados ==

Revision as of 02:31, 23 March 2010

This page is where we work through the FUDCon organization process for FUDCon:Santiago 2010. If you would like to help, please join the planning team.

FUDCon bid process

We are currently working through the FUDCon bid process. See /Bid process for our work in this section.

Proxima Reunion

25/03/2010 a las 22 horas ( Horario de Santiago - Chile )

Canal #fudcon-planning @ freenode

Reunion 11/03/2010 22:00

Minutes: http://meetbot.fedoraproject.org/fudcon-planning/2010-03-12/fudcon-planning.2010-03-12-02.30.html

Minutes (text): http://meetbot.fedoraproject.org/fudcon-planning/2010-03-12/fudcon-planning.2010-03-12-02.30.txt

Log: http://meetbot.fedoraproject.org/fudcon-planning/2010-03-12/fudcon-planning.2010-03-12-02.30.log.html

Reunion 01/01/2010 22:00

Minutes: http://meetbot.fedoraproject.org/fudcon-planning/2010-02-02/fudcon-planning.2010-02-02-01.31.html

Minutes (text): http://meetbot.fedoraproject.org/fudcon-planning/2010-02-02/fudcon-planning.2010-02-02-01.31.txt

Log: http://meetbot.fedoraproject.org/fudcon-planning/2010-02-02/fudcon-planning.2010-02-02-01.31.log.html

Embajadores confirmados

- Rodrigo Padula

- Antonio Salles

- Jonathan Barrios

- Fabrizzio Dagnino

- Daniel Bruno

Tareas

Fixar la fecha del evento

  • DONE - Antonio Salles confirmo la fecha para 15-17 Julio con la Universidad Central

Información general de Santiago

  • Mapas de Transantiago, con rutas cercanas de como llegar a FUDCon.
  • Mapa del Metro.
  • Información sobre Transantiago (sistema de transporte de Santiago).
  • Lugares de interés.
  • Hoteles (precio, ubicación, servicios).