Line 37: | Line 37: | ||
| [[Changes/Policy#Beta_deadline.2Faccepted_changes_100.25_complete|Change Checkpoint: 100% Code Complete Deadline]] | | [[Changes/Policy#Beta_deadline.2Faccepted_changes_100.25_complete|Change Checkpoint: 100% Code Complete Deadline]] | ||
|- | |- | ||
| 2015-04-14 || Beta Release | | <strike>2015-04-14</strike><br>2015-04-21 || Beta Release | ||
|- | |- | ||
| 2015-05-05 || [[Milestone freezes | Final Freeze]] (*) | | <strike>2015-05-05</strike><br>2015-05-12 || [[Milestone freezes | Final Freeze]] (*) | ||
|- | |- | ||
| 2015-05-19 || [[Fedora_22_Final_Release_Criteria | Fedora 22 Final Release]] | | <strike>2015-05-19</strike><br>2015-05-26 || [[Fedora_22_Final_Release_Criteria | Fedora 22 Final Release]] | ||
|} | |} | ||
Latest revision as of 19:04, 9 April 2015
Changes
- Fedora 22 Accepted Changes
- Before the accepted Change set is finalized, proposed changes can be found in Category:ChangeAnnounced or Category:ChangeReadyForWrangler
Key Milestones
2014-12-09 | Fedora 21 Release |
2015-01-20 | Change Checkpoint: Proposal submission deadline (System Wide Changes) |
2015-02-06 | Side Tag Builds Deadline |
2015-02-10 | Branch Fedora 22 from Rawhide |
2015-02-24 | Alpha Freeze (*) |
Software String Freeze | |
Change Checkpoint: Completion deadline (testable) | |
Bodhi activation point | |
2015-03-10 | Alpha Release |
2015-03-24 | Software Translation Deadline |
2015-03-31 | Beta Freeze (*) |
Change Checkpoint: 100% Code Complete Deadline | |
2015-04-21 |
Beta Release |
2015-05-12 |
Final Freeze (*) |
2015-05-26 |
Fedora 22 Final Release |
Detailed Schedules
- All Detailed Schedules and iCal files
- Design
- Development
- Documentation
- Marketing
- Release Engineering
- Quality Assurance
- Translation
- Web Sites
Upstream Project Schedules
Links to other significant project schedules--useful for seeing how Fedora aligns with them.
- Gnome 3.16 -- 2015-03-25
- KDE Plasma 5.3.0 -- 2015-04-28
- KDE Applications 15.04 -- 2015-04-15
Feel free to add any other significant projects schedules!