From Fedora Project Wiki
Bowlofeggs (talk | contribs) m (→Attendees and Travel Details: Turn myself into a link, just like I've always wanted) |
Maxamillion (talk | contribs) |
||
Line 54: | Line 54: | ||
| Pierre-Yves Chibon || || || || | | Pierre-Yves Chibon || || || || | ||
|- | |- | ||
| Adam Miller || || || || | | [[User:Maxamillion | Adam Miller]] || || || || | ||
|- | |- | ||
| [[User:bowlofeggs | Randy Barlow]] || -∞ || ∞ || || | | [[User:bowlofeggs | Randy Barlow]] || -∞ || ∞ || || |
Revision as of 16:38, 21 March 2017
This is the main page for a CI and Infrastructure hackathon 2017. This hackathon is intended to help the team leap ahead for several critical Fedora initiatives.
Purpose
Our purpose is to complete the following primary goals:
- Continue and/or complete key CI pipeline implementation
- This goal will be further outlined based on discussions between now and the event.
- Expand skills/knowledge of authorization/authentication systems in Fedora
- All core sysadmin team members will understand FreeIPA/Ipsilon backend administration tasks and ensure they are documented in the Fedora Infra Sysadmin Guide
- Key developers will understand changes needed in current apps and best practices for new ones, if applicable, and capture them in the Fedora Infra Developer Guide
- Establish an OpenShift Origin instance in Fedora infrastructure
- Determine the extent to which OpenShift can be expanded beyond OSBS
- Application development
- Application deployment
- Upstream collaboration with Factory 2.0
- Develop necessary playbooks, etc. to deploy
- Determine the extent to which OpenShift can be expanded beyond OSBS
Detailed Work Items & Final Attendees
Priorities
Priorities: ((AuthN/AuthZ)) | Task Owner | Done |
---|---|---|
Priorities: ((CI Pipeline)) | Task Owner | Done |
Priorities: ((OpenShift)) | Task Owner | Done |
Deliverables
AuthN/AuthZ | Task Owner | Done |
---|---|---|
More to come... |
Attendees and Travel Details
Contributor | Arrival | Departure | Roommate | Notes |
---|---|---|---|---|
Patrick Uiterwijk | ||||
Kevin Fenzi | ||||
Pierre-Yves Chibon | ||||
Adam Miller | ||||
Randy Barlow | -∞ | ∞ | ||
Jeremy Cline | -∞ | ∞ | ||
Kushal Das | ||||
Brian Stinson | ||||
Tim Flink? | ||||
Paul Frields | (unsure of stay length) | |||
Remote attendees | ||||
Planning Prerequisites
See the How to organize a FAD list; you can keep your to-do list here.
- Work out budget
- Decide on Dates and Location
- Arrange Facilities
- List Resources
- Be Somewhat Structured
- Arrange Lodging
- Arrange Refreshments
Arrange a Social Event-- N/A
Plan
- Location: Red Hat, Raleigh NC, USA
- Red Hat Tower, 9th Floor South, "Fedora" room
- Date: 2017-May-08 to 2017-May-12
- Visitors should arrive on Sunday May 7th if possible
- Remote Attendees: (include dial-in)
- Schedule
- Event starts 9:30am daily
- Event ends by noon Friday May 12th, to allow for travel outbound
- ...
Logistics
Snacks/Beverages: Can be snarfed from Raleigh office
Breakfast:
- Covered at hotel
Lunch:
- ...
Dinner:
- ...
Total food: est. $
Travel estimates
Contributor | Taxi/transport (to/from home) | Airfare | Taxi/transport (to/from site) | Parking | Other |
---|---|---|---|---|---|
- Travel: $$
- Housing: - $3200 (est)
- Sheraton or Marriott nearby
- Possibility of 1-2 people being housed locally?
- Space:
- $0 -- Supplied by Red Hat
- Supplies:
- N/A
- Food: $$
Total budget: $$