Line 19: | Line 19: | ||
** Approve package (A reviewer needs to do this : takes '''maximum time''') | ** Approve package (A reviewer needs to do this : takes '''maximum time''') | ||
** Add package to comps (I'll do this) | ** Add package to comps (I'll do this) | ||
* Easily installable PACS and DICOM viewers are higher priority. | |||
* Instead of submitting one review per week, in sequence, I'll submit many in parallel in a period over 2-3 weeks. This way, we won't need to wait on one package before diving into another. | |||
* I will have maximum time to work on this during May, the whole of June, July. End of July and August will be just a little restricted. | |||
== Timeline == | == Timeline == | ||
Line 28: | Line 31: | ||
| May 23 || May 30 || Check up, update and review currently open review requests || bugs : [[rhbug:696176|gnumed server]], [[rhbug:573910]], [[rhbug:539387]], [[rhbug:691774|elastix]], [[rhbug:66656|praat]], [[rhbug:604005|ledgersmb]], [[rhbug:570224|InsightApplications]], [[rhbug:567086|vxl]], [[rhbug:539387|InsightToolkit]], (others?) || Start with housekeeping. This would also give us a good idea of the current status of packages | | May 23 || May 30 || Check up, update and review currently open review requests || bugs : [[rhbug:696176|gnumed server]], [[rhbug:573910]], [[rhbug:539387]], [[rhbug:691774|elastix]], [[rhbug:66656|praat]], [[rhbug:604005|ledgersmb]], [[rhbug:570224|InsightApplications]], [[rhbug:567086|vxl]], [[rhbug:539387|InsightToolkit]], (others?) || Start with housekeeping. This would also give us a good idea of the current status of packages | ||
|- | |- | ||
| May 31 || June | | May 31 || June 15 || Package [http://www.dcm4che.org/ dcm4che] || Initially, it was decided to package mayam, but dcm4che contains more than just that apparently and needs looking into. || [https://fedorahosted.org/pipermail/medical-sig/2011-March/000128.html https://fedorahosted.org/pipermail/medical-sig/2011-March/000128.html]. It's one of the larger packages so I've conservatively assigned two weeks to it. | ||
|- | |- | ||
| June 16 || June 23 || Package [http://www.xs4all.nl/~ingenium/dicom.html conquest], [http://cdmedicpacsweb.sourceforge.net/Home.html cmedic] || These are the last two PACS that we currently have on the list. | |||
| June 16 || June 23 || || | |||
|- | |- | ||
| June 24 || July 1 || || | | June 24 || July 1 || || | ||
Line 40: | Line 41: | ||
| July 10 || July 17 || || | | July 10 || July 17 || || | ||
|- | |- | ||
| July 18 || July 25 || || | | July 18 || July 25 || || I'll probably have too much work in college at this time, therefore a small task. | ||
|- | |- | ||
| July 26 || August 3 || || | | July 26 || August 3 || || |
Revision as of 05:37, 1 April 2011
Title
This page details my proposal for the Fedora Medical GSoC project
Contact Information
All relevant contact information can be found on my user page.
Deliverables
- Inclusion of packages to the fedora repos.
- Easy installation of packages using the default package manager (yum/packagekit).
- In the long run : A fedora medical spin with all of the important packages included.
Intended workflow
- Start by checking the current status of the review queue
- Package the more important applications first.
- Packaging implies the following:
- Make an rpm package (I'll do this)
- Submit a review request (I'll do this)
- Approve package (A reviewer needs to do this : takes maximum time)
- Add package to comps (I'll do this)
- Easily installable PACS and DICOM viewers are higher priority.
- Instead of submitting one review per week, in sequence, I'll submit many in parallel in a period over 2-3 weeks. This way, we won't need to wait on one package before diving into another.
- I will have maximum time to work on this during May, the whole of June, July. End of July and August will be just a little restricted.
Timeline
I've divided the 4 month period into 4 milestones. This will be discussed with my mentor and edited as required.
Start date | End date | Goal | Details | Comments |
---|---|---|---|---|
May 23 | May 30 | Check up, update and review currently open review requests | bugs : gnumed server, rhbug:573910, rhbug:539387, elastix, praat, ledgersmb, InsightApplications, vxl, InsightToolkit, (others?) | Start with housekeeping. This would also give us a good idea of the current status of packages |
May 31 | June 15 | Package dcm4che | Initially, it was decided to package mayam, but dcm4che contains more than just that apparently and needs looking into. | https://fedorahosted.org/pipermail/medical-sig/2011-March/000128.html. It's one of the larger packages so I've conservatively assigned two weeks to it. |
June 16 | June 23 | Package conquest, cmedic | These are the last two PACS that we currently have on the list. | |
June 24 | July 1 | |||
July 2 | July 9 | |||
July 10 | July 17 | |||
July 18 | July 25 | I'll probably have too much work in college at this time, therefore a small task. | ||
July 26 | August 3 | |||
August 4 | August 11 | |||
August 12 | August 19 | |||
August 20 | August 27 |
MILESTONE1 : May 23 : Work begins. Packaging of EMR software.
MILESTONE2 : June 30: Packaging image processing libraries for DICOM et al
MILESTONE3 : July 30: Creating/editing the comps group file
MILESTONE4 : August 10 : Add existing packages to yum group etc.
Other information
Relevant timeline dates for GSoC can be found here
Relevant links: