From Fedora Project Wiki

Revision as of 12:43, 17 August 2010 by Pfrields (talk | contribs) (Add a line for swag)

This page tracks the budget for the FUDCon:Tempe 2011 event.

Estimates

Key: FE = Fedora Engineering; CA = Community Architecture. Hotel costs are expressed as $600 for 3 nights, double occupancy. So for every 2 people, it's a $600 cost.

Estimated cost
! Item FE Q2 CA Q2 FE Q3 CA Q3 FE Q4 CA Q4
Facilities
UTO (tech support) overtime (Sun) $ 750
MemU rooms and equipment (Mon) $ 500
Deposit for hotel block $1,000
Printing and materials (badges, etc.) $ 500
Food, drink, hospitality
Coffee/danish for 150 (Sat) $1,500
Coffee/danish for 150 (Sun) $1,500
FUDPub food & space (Sat) $4,000
Swag $1,500
Travel
3@ Airfare from Fedora Eng $1,000
12@ Hotel from Fedora Eng $3,600
4@ Airfare from Fedora Eng $1,200
4@ Airfare from Fedora Eng $1,200
Travel subsidies, airfares and hotel $8,500
TOTALS $1,000 $1,000 $1,200 $3,200 $7,600 $13,250

Running total: $27,250. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.