Q4 2008 Budget

Total Allocation $7000

Line Item Expected Cost Notes
SCaLE $500
BarCamp CLT $250
Media x86 install $1800
Media x86_64 install $1800
Media x86_64 Live $0 NOT HAPPENING
Persistent infrastructure (banners and signs) $0 | NOT HAPPENING
Case badges $0 NOT HAPPENING
Tshirts $1000 300 Fedora Tshirts
Tattoos $217 5000 Fedora Logo Tattoos
Additional Event Box $500 Event box plus posters and signs
Shipping $500 Hope that I am way over estimating this
FADNA $433 Is FADNA going to be in Q4 or Q1 2010??
TOTAL $7000 so far


This is a ROUGH guide - and designed to be flexible. NA will sacrifice things such as Event Box and limit shipping if needed to get additional events or in the event that FADNA needs more money.


Things we didn't fund

  • AmbassadorKits needs <dr.evil> $1 billion </dr.evil> for R&D
  • x86_64 Live Media